Before a project of interior design arose, a construction project was made and we got all necessary permits. The realisation required many changes in the construction of walls and ceilings. Documentation prepared by us included also projects of stuccoworks, doors and windows. We made part of the construction and assembly works. We performed architect’s supervision during the entire project.